top of page

 

  • MD 200 - Intercounty Connector, $2.4 Billion, Montgomery County, MD

  • I-95 Express Toll Lanes, $900 Million, Baltimore, MD

  • MTA Purple Line Program Management Subconsultant- Baltimore, MD

  • I-70/MD 85/MD 355 Interchange, $70 Million, Frederick, MD

  • MD 24 Construction Manager At Risk (CMAR) Independent Cost Estimator (ICE)

  • MD 97 Brookeville Bypass Construction Manager At Risk (CMAR) Independent Cost Estimator (ICE)

  • Chesapeake Bay Bridge Painting –Claims Analysis

  • Baltimore Harbor Tunnel Lighting Upgrade-CPM Scheduling

  • Baltimore Harbor Tunnel Drainage Repairs-CPM Scheduling

  • CHART Depot Building for MSHA- CPM Scheduling

  • I-95/MD 24 Interchange – Claims Analysis

  • I-270/I-495 Programmatic GEC for P3 Managed Lanes Study

SCHEDULING, CLAIMS ANALYSIS, COST ESTIMATING & PROJECT MANAGEMENT

 

  • MD 404 From US 50 to East of Holly Rd

  • MD 4 Suitland Parkway, Prince Georges County, Maryland

  • I-695 MD 144 to North of Ingleside Ave Outer Loop Widening, Baltimore County, MD

  • US Route 40 Bridge over Patapsco River, $ 21 Million, Baltimore and Howard Counties, Maryland

  • MD 355 and Cedar Lane – BRAC Intersection Reconstruction, Montgomery County, MD

  • MD 97 (Georgia Avenue) at Randolph Road, $90 Million, Montgomery County, MD

  • Goshen Road Improvements, Montgomery County, MD

  • US 40 – BRAC -Interchange at South Philadelphia Boulevard (US 40) and Short Lane (MD 715), Harford County, MD

  • I-270/I-495 Programmatic GEC for P3 Managed Lanes Study

CONSTRUCTABILITY REVIEW
CONSTRUCTION INSPECTION
  • Baltimore Advanced Metering Infrastructure and Water Meter System Installation, BCDPW

  • MD 355 Safety, Resurfacing & ADA Compliance, Rockville, MD

  • MD 410 from MD 185 to MD 355 Safety, Resurfacing & Streetscape, Bethesda, MD
  • MD 185 Safety, Resurfacing & ADA Compliance, Montgomery County MD
  • I-495 Northwest Branch Bridge Rehabilitation Mill & Overlay, SHA
  • Contee Road Over I-95, SHA
  • I-95/MD43 Interchange, Baltimore, MDTA
  • Various TMDL Sites throughout Maryland, SHA
  • William Lane Preston Memorial (Chesapeake Bay) Bridge, MDTA
  • Baltimore Harbor Tunnel, MDTA
  • I-95 Corridor Sign Upgrade, MDTA
  • MD 200 - Intercounty Connector Contract C Structures QA/QC Oversight- MDTA/SHA
  • Rehabilitation of Ramp J over Hanover Street to SB I-95-MDTA
  • I-95 Express Toll Lanes -MDTA
  • I-95 / I-895 NB General Purpose Lanes, I-895/ Moravia Road Interchange-MDTA
  • William Preston Lane Memorial Bay Bridge Painting-MDTA

 

  • Intercounty Connector - Numerous Environmental Mitigation Construction Projects, $100 Million, Statewide-MD

  • VE Study for US 29 at Fairland and Musgrove Roads, Silver Spring, MD

  • VE Study for US 1 at College Park, Prince Georges County, MD

  • VE Study for I-81 and I-795 at Dolfield Road, Baltimore County, MD

ENVIRONMENTAL REVIEW & VALUE ENGINEERING
LEGAL SUPPORT
  • MTA Purple Line Program Management Subconsultant- Baltimore, MD

  • Tampa Bay Water Authority C.W. Bill Young Regional Reservoir Litigation Support, $100 Million, Tampa, FL

  • Port Newark Asphalt Repairs Litigation Support, $1 Million, Port Newark, NJ

NOTABLE PROJECTS

bottom of page